Bare ActsThe Delhi Water & Sewer (Tariff & Metering) Regulations, 2012

Section 3

Amendment status not verified — confirm the current text below against the official source.

Water Connection (a) (b) (c) (cd) (€) (f (g) (h) (i) A regular connection shall be considered, on receipt of an application in the prescribed format as provided in Annexure-l of Schedule-I hereto alongwith requisite documents and fees as prescribed in Annexure-Il of Schedule-[. Application may be made by the owner/occupier of a property once the construction is completed in that property or by the owner/occupier of such premises where Board has provided/ extended water distribution system in that area after the construction provided that such construction is authorized one. No person is authorised or allowed to draw water from Board’s water system by any means other than through sanctioned water connection. No regular connection will be allowed in a vacant plot/prece of land. No individual connection will be sanctioned to any flat or house tn a co- operative group housing society’ apartment complex or other domestic/non- domestic complexes where bulk connection either exists or is required to be given under the policy in force of the Board. No water connection will be sanctioned for the basement of any building. Individual water connection will be sanctioned for a single dwelling unit / floor subject to maximum of six in a property. Assessment of technical feasibility and sanction of Bulk water connection whl be the jurisdiction of Executive Engineer concerned. ZRO will forward the file accordingly after completing the formalities. Water supply shall not be provided unless arrangement for proper disposal of waste water exists. 4, Sewer Connection (a} Wherever sewage system is in existence and maintained by the Board, it shall be mandatory for a consumer to cbtam a sewer connection by submitting application in the format prescribed in schedule-t after paying requisite fee and charges, failing which, besides disconnection of water supply bill will be raised to such consumer in respect of Sewer charges and/or Development Charges. (b) Application may be made by the owner/occupier of a property once the construction is completed in that property or by the owner/occupier of premises where Board has laid sewerage facilities in a particular locality after the construction; provided such construction is authorized. (c) No person is authorized or allowed to put sewage in Board sewerage system other than through sanctioned sewerage connection. (d} No regular sewer connection will be allowed in a vacant plot/piece of land. (e} No individual connection will be granted to any flat or house in a co- operative group housing society/apartment complex or other domestic/non- domestic complexes where bulk connection either exists or is required to be given under the policy in force of the Board. (f} No Sewer connection will be sanctioned in the basement of any building. & CFR

Section 3 – The Delhi Water & Sewer (Tariff & Metering) Regulations, 2012 | DailyLaw.ai