Extracted from the PDF above. The PDF is authoritative.
W.P.No.43305 of 2025 IN THE HIGH COURT OF JUDICATURE AT MADRAS DATED: 06.01.2026
CORAM :
THE HONOURABLE MR. MANINDRA MOHAN SHRIVASTAVA, CHIEF JUSTICE AND THE HONOURABLE MR.JUSTICE G.ARUL MURUGAN W.P.No.43305 of 2025 S.Sasi S/o.Shanmugam, 1/65, Solasiramani Post, Paramathi Velur Taluk, Namakkal District Petitioner Vs 1.The District Collector Collectorate Office, Namakkal District 2.The Block Development Officer (Village Panchayat), Union Office, Thiruchengode, Namakkal District 3.The Special Officer Molasi Village Panchayat, Molasi Post, Thiruchengode, Namakkal District ______________ p. 2 W.P.No.43305 of 2025 4.The Special Chief Engineer Water Resource Organization, Upper Cauvery Basin Scheme, Salem 5.The Executive Engineer Water Resources Organization, Sarabanga Basin Scheme, Salem 6.Kuppirikkapalayam Small Farmers Lift Irrigation Society, Rep. by its President, No.2/272, Molasi-637210 Thiruchengode Taluk, Namakkal District 7.Bakkiyavalasu Small Farmers Lift Irrigation Society, Rep. by its President, No.2/274, Molasi-637210, Thiruchengode Taluk, Namakkal District 8.Devampalayam Small Farmers Lift Irrigation Society, Rep. by its President, No.2/59B, Padugaittottam Molasi-637 210 Thiruchengode Taluk, Namakkal District Respondents PRAYER
: Petition filed under Article 226 of the Constitution of India seeking issuance of a writ of mandamus to direct the respondents 1 to 5 to consider petitioner’s representation dated 28.7.2023 seeking to remove the unauthorized construction put up by the respondents 6 to 8 in Cauvery River Survey No.346 in Molasi village, Thiruchengode Taluk, Namakkal District. ______________ p. 3 W.P.No.43305 of 2025 For Petitioner: Mr.L.Mouli For Respondents: Mr.K.Karthik Jagannath Government Advocate for respondent Nos.1 to 5
ORDER (Order of the Court was made by the Hon'ble Chief Justice) Heard learned counsel for the parties.
2. The petitioner has filed this petition, styled as public interest litigation, seeking a direction to the official respondents to remove the alleged unauthorised construction put up by respondent Nos.6 to 8 in Cavery River Survey No.346 in Molasi Village, Thiruchengode Taluk, Namakkal District.
3. After we issued notice to the respondents, the official respondents have placed on record that certain irrigation societies were granted permission to draw water by installing motor pumps.
4. Learned State counsel would submit that the constructions made are for the purpose of covering the electric motors and keep ______________ p. 4 W.P.No.43305 of 2025 them safe and no other construction has been raised.
5. In view of the statement so made by learned State counsel, we are not inclined to keep this petition pending. The writ petition is
disposed of with a direction that except the present construction for keeping the electric motors safe, no further construction shall be allowed to the raised. There shall be no order as to costs.
(MANINDRA MOHAN SHRIVASTAVA, CJ) (G.ARUL MURUGAN,J)
06.01.2026 Index : Yes/No Neutral Citation : Yes/No bbr ______________ p. 5 W.P.No.43305 of 2025 To: 1.The District Collector Collectorate Office, Namakkal District 2.The Block Development Officer (Village Panchayat), Union Office, Thiruchengode, Namakkal District 3.The Special Officer Molasi Village Panchayat, Molasi Post, Thiruchengode, Namakkal District 4.The Special Chief Engineer Water Resource Organization, Upper Cauvery Basin Scheme, Salem 5.The Executive Engineer Water Resources Organization, Sarabanga Basin Scheme, Salem ______________ p. 6 W.P.No.43305 of 2025 THE HON'BLE CHIEF JUSTICE AND G.ARUL MURUGAN,J. bbr W.P.No.43305 of 2025
06.01.2026 ______________