CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
IN THE HIGH COURT OF KARNATAKA AT BENGALURU
DATED THIS THE 16TH DAY OF OCTOBER, 2026
BEFORE
THE HON'BLE MR. JUSTICE PRADEEP SINGH YERUR
MISCELLANEOUS FIRST APPEAL NO. 6731 OF 2026 (CPC)
BETWEEN:
JAYAMMA W/O S. RAJU, AGED ABOUT 50 YEARS R/AT NO.17, NEAR TCH COLLEGE HARINAGAR CROSS, MUNISHWARA BLOCK, ANJANAPURA BENGALURU-560 062 …APPELLANT
(BY SRI.NAVEENKUMAR S., ADVOCATE)
AND:
VANI MURLIDHAR W/O MURLIDHAR AGED ABOUT 64 YEARS R/AT NO.82, 39TH B CROSS, MR LAYOUT, 14TH MAIN 4TH BLOCK JAYANAGAR BENGALURU- 560 041 …RESPONDENT
(BY SRI.SHIVARUDRAPPA SHETKAR., ADVOCATE FOR C/R)
THIS MFA IS FILED U/O.43 RULE 1(r) OF THE CPC, AGAINST THE ORDER DT. 29.07.2026 PASSED ON IA NO.1 IN O.S.NO. 2549/2026 ON THE FILE OF THE XXXV ADDITIONAL
Digitally signed by VINUTHA M Location: HIGH COURT OF KARNATAKA
- 2 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
CITY CIVIL AND SESSIONS JUDGE, BENGALURU CCH-36, ALLOWING THE IA NO. 1 FILED U/O.39 RULE 1 AND 2 OF CPC,
1908.
THIS APPEAL, COMING ON FOR ADMISSION, THIS DAY,
JUDGMENT WAS DELIVERED THEREIN AS UNDER:
CORAM: HON'BLE MR. JUSTICE PRADEEP SINGH YERUR
ORAL JUDGMENT
This appeal is preferred by the appellant, who is the defendant before the trial Court, questioning the impugned
order dated 29.07.2026 passed on I.A.Nos.1 and 2 in O.S.No.2549/2026 by the XXXV Additional City Civil & Sessions Judge, Bengaluru. 2. The respondent is the plaintiff before the trial Court. 3. Parties to the proceedings shall be referred to as plaintiff and defendant, for the sake of brevity. 4. Plaintiff filed a suit against the defendant for the relief of permanent injunction with regard to the suit schedule property bearing Site No.31, Khatha No.155/4A, situated at Kothanur village, Uttarahalli Hobli, Bengaluru South Taluk
- 3 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
measuring East to West: 40 feet, North to South: 30 feet in all of 1200 sq. ft. 4.1. Along with the suit, an application came to be filed under Order 39 Rule 1 and 2 of CPC by the plaintiff seeking for an order of temporary injunction restraining the defendant from interfering with the plaintiff's peaceful possession and enjoyment over the suit schedule property. 4.2. The defendant made her appearance; filed statement of objections; denied the claim so made by the plaintiff and sought for dismissal of the application by contending that she is the absolute owner of the suit schedule property, having purchased the same by way of a registered sale deed dated 07.04.2017 executed by her vendor and thereafter, she has been in peaceful possession and enjoyment of the suit schedule property and there is a shed in the suit schedule property. It is also a plea taken by the defendant that prior to the sale deed of the defendant, the vendors of the defendant had a valid sale deed and there was a shed existing in the suit schedule property and pursuant to the purchase
- 4 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
made, sanctioned building plan has been obtained for construction of the residential house; electricity connection and water connection have been taken and the property tax has been regularly paid with regard to the property in question. The khatha has also been transferred in the name of the defendant and she has been enjoying the suit schedule property as absolute owner. 4.3.
The trial Court, upon hearing the learned counsel for both parties and on perusal of the materials placed by both parties, came to the conclusion that the plaintiff has made out a prima facie case for grant of an order of temporary injunction and accordingly, allowed the application and thereby restrained the defendant from interfering with the peaceful possession and enjoyment of the plaintiff over the suit schedule property. 4.4. It is this order of grant of temporary injunction which is challenged by the defendant in this appeal. 5. It is the vehement contention of learned counsel appearing for the appellant-defendant that the impugned order passed by the learned trial Judge is perverse, illegal and
- 5 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
arbitrary, and the same is liable to be set aside. It is further contended by the learned counsel for the appellant-defendant that the trial Court has not taken into consideration the materials placed on record both oral and documentary and has also not considered the defence of the defendant with regard to she, being the absolute owner, is in actual physical, lawful and settled possession over the suit schedule property. Learned counsel further contends that the trial Court has committed perversity in holding that the plaintiff has established a prima facie case merely on the basis of a registered sale deed dated 05.06.2003 and revenue records without properly determining whether the plaintiff was in actual physical possession and enjoyment of the suit schedule property as on date of filing of the suit. 5.1. Learned counsel further contends that the trial Court has failed to appreciate the continuous chain of title of the appellant-defendant commencing from the registered sale deed dated 07.05.1992 in favour of Smt.Kamakshi, followed by the subsequent sale deed dated 25.08.1997 in favour of Punniya and others and the subsequent sale deed dated
- 6 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
21.08.2002 in favour of Smt.Kamalamma and the next sale deed dated 16.07.2013 in favour of Sri.H.R.Nagesh culminating into the registered sale deed dated 07.04.2017 in favour of the appellant-defendant. These documents have been conveniently ignored by the learned trial Court while passing the impugned
order. 5.3. Learned counsel further contends that the trial Court has also not taken into consideration the possession and enjoyment of the suit schedule property by the defendant, the sanctioned building plan provided to the defendant, the sanction of the BESCOM for grant of electricity connection, the tax paid receipt for Khatha, the electricity bills having been paid and the record standing in the name of the defendant and her vendor Sri.H.R.Nagesh, which clearly shows that the property in question belonged to the defendant and prior to that, her vendors narrated hereinabove. 5.4. It is also contended by learned counsel that the chain of documents clearly demonstrate the continuity of possession of the defendant and her predecessors from the
- 7 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
time of the initial purchase of the erstwhile vendor i.e., Smt.Kamakshi. 5.5. Learned counsel further contends that the trial Court has committed an error in coming to a conclusion that the rectification deeds dated 28.01.2013 and 06.01.2014 have given different colour to the schedule mentioned in the property without there being a proper clarity in the rectification which ought to have been made in the first document of sale deed rather than the subsequent documents whereby the property is rectified without there being any correlation to the earlier sale deeds. Learned counsel further contends that when the defendant has come to the Court claiming that she is the owner of the suit schedule property, obtained several statutory documents from the municipal authorities and the tax paid receipt, Khatha, encumbrance and other documents showing the name of the defendant and she being in possession, putting up construction in the suit schedule properties, are conveniently ignored and once the defendant has taken such a plea, the plaintiff could not have continued and maintained the
- 8 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
suit for bare injunction when there is a cloud of title created by the defendant over the title of the plaintiff. 5.6. Learned counsel further contends that the question of rectification deeds and whether the property is correctly described in the suit schedule and in the rectification deeds matches the same or not are all matters to be decided during the course of trial.
The same cannot be decided while granting an order of temporary injunction as the principles governing of grant of temporary injunctions are different from that of the principles governing the permanent injunction suit. The question to be considered by the Court is who is in physical, lawful possession of the property and with regard to the documents are to be all decided in the course of trial while considering an application under Order 39 Rule 1 and 2 of CPC.
Learned counsel contends that the trial Court ought to have kept in mind the three essential requirements of prima facie case, balance of convenience and the hardship that would be caused rather than going into a mini trial. On these grounds, he contends that when the defendant has produced sufficient cogent material to show the previous chain of title of the
- 9 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
vendors and there being a shed in the suit schedule property which was earlier existing and photographs having been produced to show that the shed was being demolished and a construction has been put up by the defendant, the trial Court ought to have taken all these aspects into consideration and pass an equitable order in favour of the defendant rather than the plaintiff. On these grounds, he contends that the impugned
order passed by the learned trial Judge deserves to be set aside. Hence, he seeks to allow the appeal. 6. Per contra, learned counsel appearing for the respondent-plaintiff vehemently contends that the plaintiff is the absolute owner of the property bearing No.155/4A as mentioned in the suit schedule property and she has purchased the suit schedule property by way of registered sale deed which is produced along with the plaint dated 05.06.2003 and that it is a claim of the plaintiff that the defendant, who is an adjacent owner of the suit schedule property, is trying to interfere with the possession and enjoyment of the plaintiff over the suit schedule property and making an unauthorized and unlawful entry into the suit schedule property. Hence, she was
- 10 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
constrained to file a suit against the defendant to ward off and to prevent her from taking unlawful possession and protect the suit schedule property from the plaintiff. 6.1. It is also contended by learned counsel that the defendant has conveniently suppressed the rectification deeds which are created subsequently to show that there is a change made with regard to the schedule of the property changing the number from survey No.155/4B to survey No.155/4A only in the rectification deed and all the documents which are produced by the defendant pertain to survey No.155/4B and does not pertain to the suit schedule property. Therefore, he contends that the subsequent rectification which is made will not benefit and entitle any relief or provide any title to the defendant or to the vendors of the defendant as the rectification so made changing the survey number from survey No.155/4B to survey No.155/4A is itself illegal and not sustainable as rectification deed cannot be for subsequent sale deed as it has to be from the original first sale deed, which is not the case on hand. Therefore, he contends that the plaintiff has been in peaceful possession and enjoyment of the suit
- 11 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
schedule property, which the trial Court has rightfully observed and has granted an order of interim injunction restraining the defendant from interfering with the peaceful possession and enjoyment of the plaintiff over the suit schedule property. On these grounds, learned counsel for the respondent seeks dismissal of the appeal. 7.
I have heard the learned counsel for the appellant- defendant and learned counsel for the respondent-plaintiff. 8. Apparently, it is not in dispute that the suit is filed by the plaintiff for the relief of bare injunction. Plaintiff claims title over the suit schedule property measuring to an extent of 40 feet x 30 feet in all measuring 1200 square feet by virtue of a registered sale deed dated 05.06.2003. It is also the case of the plaintiff that the defendant is an adjacent owner of the suit schedule property, who is making an unlawful attempt to interfere with the suit schedule property of the plaintiff. Whereas on the contrary, it is the case of the defendant that she claims that the suit schedule property is a property owned by her by virtue of a registered sale deed dated 07.04.2017
- 12 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
and that the defendant, pursuant to purchase of the suit schedule property, has demolished the existing shed and is now putting up construction in the suit schedule property. The defendant's claim is that the vendors of the defendant have a valid title and those documents have also been produced before the Court. It is also the case that the rectification deed has been entered into subsequently with regard to the property number which has to be changed and so also the measurement. 9. Be that as it may, the trial Court has examined all these aspects and come to a conclusion that there is a construction which is carried out by the defendant in the suit schedule property and also has arrived at a conclusion that the defendant has produced the similar set of documents as that of the plaintiff that are sale deeds, tax paid receipts, electricity bills and photographs, which demonstrate property being renovated with regard to the existing house.
However, the trial Court did not find favour with the defendant and by agreeing with the plaintiff, came to the conclusion that the plaintiff has made out a prima facie case and also the balance of
- 13 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
convenience would tilt in favour of the plaintiff rather than that of the defendant and also irreparable injury and hardship would be caused to the plaintiff rather than the defendant. 10.
Learned counsel for the defendant has placed several photographs as elicited in the impugned order by the learned trial Judge with regard to the construction being put up by the defendant in the suit schedule property. These photographs are taken out on 23.01.2026 that is much prior to the date of filing of the suit. The electricity connection and the other sanction plan are also taken prior to the date of filing of the suit in the month of January. These are materials which are placed on record before the trial Court. The trial Court, though mentioned about these documents produced by the defendant and the construction activity in the suit schedule property, has come to the conclusion that the plaintiff has made out a prima facie case and the balance of convenience would tilt in her favour rather than that of the defendant. 11. The issues before the Court are, whether the plaintiff is in lawful possession of the suit schedule property or
- 14 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
the defendant? and whether the injunction could be granted in favour of the parties? 12. Though the plaintiff has raked up the issue with regard to the rectification having been sought and made lately, which is not correct as the original document of the title of the first person was not rectified with regard to survey No.155/4A as original site was survey No.155/4B so also the dimension of the suit schedule property and also the boundaries. 13. While appreciating the contentions of the parties on an application filed under Order 39 Rule 1 and 2 of CPC, what is required to be seen by the trial Court is three essential elements of prima facie case, balance of convenience and irreparable injury and hardship that would be caused more to which of the party. 14. Admittedly, the suit is filed for bare injunction by the plaintiff against the defendant. The defendant upon appearance has already taken a plea that she is the owner of the suit schedule property in possession, enjoyment and
- 15 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
putting up construction by demolishing the existing structure.
The photographs to that extent have already been produced, including the sanctioned plan, the khatha, the tax paid receipt, the building's license having been granted, the electricity connections and other relevant documents. The trial Court has looked into all these documents and has come to the conclusion that the prima facie case is made out by the plaintiff. 15. In my opinion, what is required to be seen by the trial Court is despite making out a prima facie case to go in for trial, whether the balance of convenience would tilt in favour of the plaintiff or the defendant? Secondly, whether the irreparable injury and hardship would be caused to the plaintiff or to the defendant? 16. No doubt there is a dispute with regard to the property, the measurement and the boundaries by the plaintiff and that of the defendant. As according to the plaintiff, the defendant's property was initially survey No.155/4B and not survey No.155/4A which is claimed by the plaintiff. Subsequently by way of rectification deed, the property number
- 16 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
has been changed from survey No.155/4B to survey No.155/4A, which dispute is to be decided by the trial Court during the course of trial. 17. While considering the principles for grant of temporary injunction, even if there is a prima facie case made out by the plaintiff to go in for trial, the other two essential elements have to be looked into by the trial Court while considering application under Order 39 Rule 1 and 2 of CPC for grant of temporary injunction, namely the balance of convenience and the irreparable injury and hardship that would be caused to which of the party. 18. In the present case on hand, the trial Court has clearly noticed that the defendant is currently renovating and putting up construction in the suit schedule property, which would apparently mean that it is the defendant who is putting up construction in the suit schedule property.
Whether it is survey No.155/4B or survey No.155/4A is a matter of trial which would have to be decided during the course of trial. - 17 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
19. The Hon'ble Apex Court in the case of Kashi Math Samsthan and another vs. Shrimad Sudhindra Thirtha Swamy and another1 in paragraph No.16 held as under:
"16. It is well settled that in order to obtain an
order of injunction, the party who seeks for grant of such injunction has to prove that he has made out a prima facie case to go for trial, the balance of convenience is also in his favour and he will suffer irreparable loss and injury if injunction is not granted. But it is equally well settled that when a party fails to prove prima facie case to go for trial, question of considering the balance of convenience or irreparable loss and injury to the party concerned would not be material at all, that is to say, if that party fails to prove prima facie case to go for trial, it is not open to the court to grant injunction in his favour even if, he has made out a case of balance of convenience being in his favour and would suffer irreparable loss and injury if no injunction order is granted. Therefore, keeping this principle in mind, let us now see whether the appellant has been able to prove prima facie case to get an order of injunction during the pendency of the two appeals in the High Court."
1 (2010) 1 SCC 689
- 18 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
20. It is also held in the very same Judgment that merely if a prima facie case is made out, it is not necessary that an order of temporary injunction requires to be granted. The Court will also have to consider whether the balance of convenience would tilt in favour of the plaintiff and the irreparable injury would be caused to the plaintiff in case of non-grant of temporary injunction. 21. When the trial Court has come to a conclusion that the defendant is putting up construction in the suit schedule property, the trial Court ought not to have granted an order of temporary injunction in favour of the plaintiff as it is the defendant who would be put into irreparable injury and hardship as she has already started putting up construction in the suit schedule property by investing money and material.
Even it may be that the plaintiff may succeed in the suit ultimately after the course of trial, upon such event happening, there could be a condition imposed by the trial Court that the defendant would not be having liberty to claim equity and would also have to part way with the property in case of the plaintiff succeeding in the suit. Once the Court comes to a
- 19 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
conclusion that the defendant is putting up construction in the suit schedule property, the question of prima facie case being made out by the plaintiff would not arise and therefore, the
order impugned passed by the trial Court is not sustainable and would have to be interfered.
22. Accordingly, I pass the following:
ORDER i) This appeal stands allowed.
ii) The impugned order dated 29.07.2026 passed on I.A.Nos.1 and 2 by the trial Judge in O.S.No.2549/2026 is hereby set aside. Consequently, I.A.No.2 filed by the defendant under Order 39 Rule 4 of CPC stands allowed.
iii) The temporary injunction order granted in favour of the plaintiff stands vacated.
iv) However, it is made clear that this Court has not expressed any opinion on the merits of the matter. v) All contentions of the parties are kept open.
vi) Any observations made by this Court are strictly only to decide the applications filed
- 20 -
HC-KAR
CNR: KAHC010637132026 NC: 2026:KHC:58984 MFA No. 6731 of 2026
under Order 39 Rule 1 and 2 of CPC and Order 39 Rule 4 of CPC.
vii) It is open for both the parties to advert to the pleadings with regard to the site numbers, the rectification deeds, so also the measurements and the boundaries.
Ordered accordingly.
Sd/- (PRADEEP SINGH YERUR) JUDGE