Research › Search › Judgment

Madras High Court · body

2026 DAILYLAW 59209 (MAD)

S.MURALIDHARAN v. The Commissioner

WP/6467/2026 · 2026-07-30

G Arul Murugan

Transfer Petitionbody2026

Judgment text

Extracted from the PDF above. The PDF is authoritative.

W.P.No.6467 of 2026 IN THE HIGH COURT OF JUDICATURE AT MADRAS DATED : 30.07.2026 CORAM : THE HONOURABLE MR.SUSHRUT ARVIND DHARMADHIKARI, CHIEF JUSTICE AND THE HONOURABLE MR.JUSTICE G.ARUL MURUGAN W.P. No. 6467 of 20 26 AND W.M.P.Nos.7031 & 7033 of 2026 S.Muralidharan S/o.P.Sivalingam F1, No.40, R.S.Sridhar Street, Kottur Chennai-600 085 Petitioner(s) Vs 1.The Commissioner Greater Chennai Corporation Ripon Building, Chennai-600 003 2.The Managing Director Chennai Metropolitan Water supply and Sewerage Board No.1, Pumping Station Road Chennai-600 002 3.The Chairman Tamil Nadu Electricity Board (TANGEDCO) Anna Salai, Chennai-600 002 4.The Commissioner of Police Greater Chennai Traffic Police, Vepery, Chennai-600 007 Respondent(s) _________ https://www.mhc.tn.gov.in/judis https://www.mhc.tn.gov.in/judis W.P.No.6467 of 2026 PRAYER: Petition filed under Article 226 of the Constitution of India seeking issuance of a writ of mandamus directing the respondents to formulate a standard operating procedure for any kind of future excavation on Chennai public roads, where all 4 respondents will work in tandem and ensure that the Article 21 is upheld in terms of Rights to health, privacy, shelter, clean environment, peaceful existence and good sleep at night without any disturbance. For Petitioner(s): Mr.S.Muralidharan Petitioner-in-person For Respondent(s):Mr.E.C.Ramesh Standing Counsel for R1 Mr.Krishna Ravindran Standing Counsel for R2 Mr.L.Jaivenkatesh Standing Counsel for R3 Mr.M.I.Khaleel Government Advocate (Crl. Side) for R4 ORDER (Made by G.ARUL MURUGAN, J.) The public interest litigation is filed seeking a direction to the respondents to formulate a Standard Operating Procedure for all future excavations on public roads in Chennai, whereby all the Departments including Metro Water, Electricity Board, and police authorities will work in tandem. _________ https://www.mhc.tn.gov.in/judis https://www.mhc.tn.gov.in/judis W.P.No.6467 of 2026 2. The petitioner-in-person submitted that due to unplanned storm water drain construction by the Corporation, citizens and residents are facing severe hardships that must be addressed. He further submitted that the works are being carried out in an unplanned manner, endangering the public and passersby due to open drains being left exposed, which has already led to accidents. 3. In response to the allegations, the Corporation filed status reports stating that whenever storm water drain works are undertaken, they are executed by issuing contracts and the tenderer before commencing construction, inspects the site and the Electricity Board, Metro Water, Telephone, and all other authorities are duly intimated about the execution of the work and the work is carried out only after obtaining necessary permissions from the police authorities. 4. A separate status report was filed by the fourth respondent police department stating that, upon receiving applications, permissions for road cut excavations are granted by issuing proceedings for a strict 30-day period and every effort is made to ensure that the works are carried out in a planned and phased manner _________ https://www.mhc.tn.gov.in/judis https://www.mhc.tn.gov.in/judis W.P.No.6467 of 2026 to avoid causing obstructions or disturbances to the public and passersby. 5. The grievance exposed by the petitioner-in-person is about the storm water drain works carried out by the Corporation, in different locations in the city. Even though the Corporation submits that steps are being taken to ensure safe and expeditious completion, it is to be noted that in several places, due to ongoing storm water drain works, there are certain issues which are need to be addressed by the Corporation. 6. Further, if the Corporation coordinates with all other departments before undertaking these works, several other difficulties and public hardships can be avoided. Executing the works in a planned manner would also prevent repeated road digging, thereby preventing damage to utilities managed by other departments. 7. To ensure that these issues are addressed by the Corporation, we permit the petitioner to submit a detailed complaint/representation before the Corporation in respect of a specific area, within a period of four weeks from today. On receipt of such complaint/ representation, _________ https://www.mhc.tn.gov.in/judis https://www.mhc.tn.gov.in/judis W.P.No.6467 of 2026 the Corporation shall look into the same and take necessary efforts and steps in coordination with other departments, to ensure that the storm water drain works are carried out out in a safe and secure manner without causing undue hardship to the public. 8. With these observations, the writ petition stands disposed of. There shall be no order as to costs. Connected miscellaneous petitions are closed. (SUSHRUT ARVIND DHARMADHIKARI, CJ) (G.ARUL MURUGAN, J) 30.07.2026 Index : Yes/No Neutral Citation : Yes/No gya _________ https://www.mhc.tn.gov.in/judis https://www.mhc.tn.gov.in/judis W.P.No.6467 of 2026 THE HON'BLE CHIEF JUSTICE AND G.ARUL MURUGAN,J. gya To 1.The Commissioner Greater Chennai Corporation Ripon Building, Chennai-600 003 2.The Managing Director Chennai Metropolitan Water supply and Sewerage Board No.1, Pumping station Road Chennai-600 002 3.The Chairman Tamil Nadu Electricity Board (TANGEDCO) Anna Salai, Chennai-600 002 4.The Commissioner of Police Greater Chennai Traffic Police, Vepery, Chennai-600 007 W.P. No. 6467 of 20 26 30.07.2026 _________ https://www.mhc.tn.gov.in/judis https://www.mhc.tn.gov.in/judis