HARI CHAND HANS v. BALWINDER SINGH (SINCE DECEASED THROUGH HIS LRS) AND OTHERS
CR/4820/2026 · 2026-07-13
Harpreet Kaur Jeewan
body2026
DailyLaw.ai
[ 2026 DAILYLAW 29740 (PNJ) · dailylaw.ai ]
DailyLaw.ai
[ 2026 DAILYLAW 29740 (PNJ) · dailylaw.ai ]
Judgment text
Extracted from the PDF above. The PDF is authoritative.
CR-4820-2026
IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA 158+388 Hari Chand Hans
Balwinder
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
Present:
HARPREET KAUR JEEWAN, J.
HARPREET KAUR JEEWAN, J.
HARPREET KAUR JEEWAN, J.
HARPREET KAUR JEEWAN, J.
1.
he is owner of the property bearing Panchkula and sought defendant Nos.1 to 4 construction to demolish (adjoining that till the decision of the suit, defendant Nos.1 to 4 may be restrained from raising any sort of construction against the norms of the H Shehri Vikas the aforesaid Structure Engineer. 2026 -1- IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA AT CHANDIGARH AT CHANDIGARH AT CHANDIGARH AT CHANDIGARH CM CM CM CM Hari Chand Hans
Versus
Balwinder Singh (deceased) through LRs and others
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
Mr. Rohit Sud, Advocate, Mr. Sameesh Bassi, Advocate, Mr. Ishant Pathak, Advocate, for the petitioner. Mr. Akshay Jindal, Senior Advocate, with Mr. Vrishank Suri, Advocate, for the respondents.
HARPREET KAUR JEEWAN, J.
HARPREET KAUR JEEWAN, J.
HARPREET KAUR JEEWAN, J.
HARPREET KAUR JEEWAN, J. The petitioner-plaintiff filed a suit seeking declaration that he is owner of the property bearing Panchkula and sought permanent injunction restraining the respondent defendant Nos.1 to 4, from raising any sort of illegal and unauthorized construction and further sought mandatory injunction demolish the structure of House No (adjoining house). An application seeking interim relief was that till the decision of the suit, defendant Nos.1 to 4 may be restrained from raising any sort of construction against the norms of the H ikas Pradhikaran (HSVP) and the Haryana the aforesaid House No.705 and also requested for appointment of Structure Engineer.
IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA IN THE HIGH COURT OF PUNJAB AND HARYANA AT CHANDIGARH AT CHANDIGARH AT CHANDIGARH AT CHANDIGARH CM CM CM CM----13269 13269 13269 13269----CII CII CII CII----2026 IN/AND 2026 IN/AND 2026 IN/AND 2026 IN/AND CR CR CR CR----4820 4820 4820 4820----2026 2026 2026 2026 (O&M) (O&M) (O&M) (O&M) Decided Decided Decided Decided on : on : on : on : 13 13 13 13.07 .07 .07 .07.2026 .2026 .2026 .2026
...Petitioner Singh (deceased) through LRs and others
...Respondents
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN
CORAM: HON’BLE MS. JUSTICE HARPREET KAUR JEEWAN Mr. Sameesh Bassi, Advocate,
Senior Advocate, with Mr. Vrishank Suri, Advocate, plaintiff filed a suit seeking declaration that he is owner of the property bearing House No.706, Sector 11, permanent injunction restraining the respondent- from raising any sort of illegal and unauthorized further sought mandatory injunction o.705, Sector 11, Panchkula application seeking interim relief was also filed that till the decision of the suit, defendant Nos.1 to 4 may be restrained from raising any sort of construction against the norms of the Haryana radhikaran (HSVP) and the Haryana Building Code in ouse No.705 and also requested for appointment of ATUL SETHI 2026.07.16 12:45 I attest to the accuracy and authenticity of this document Chandigarh
CR-4820-2026
2. sought a technical report of inspection. The Engineers of Punjab Engineering College i 03.04.2024 (Annexure P conclusions and measures to 2026 -2- Initially, the trial Court passed order dated 23.02.2023 and sought a technical report of inspection. The Engineers of Punjab Engineering College inspected the site and submitted a report dated .04.2024 (Annexure P-7). As per the said report, while giving conclusions and final recommendations to rectify the damage in house No.706 were given as under:
“CHAPTER 4 CHAPTER 4 CHAPTER 4 CHAPTER 4 CONCLUSIONS AND FINAL RECOMMENDATIONS CONCLUSIONS AND FINAL RECOMMENDATIONS CONCLUSIONS AND FINAL RECOMMENDATIONS CONCLUSIONS AND FINAL RECOMMENDATIONS
The two houses i.e. House Nos. 706 and 705 were studied for their structural stability. It was found that the major damage in House No.706 occurred mainly due to settlement of soil below its foundation during the excavation of soil in House No.705 without having followed adequate protective measures for stability of the adjoining soil strata. Further, outside the kitchen area of House No. 706, it was seen that soil conditions were very poor as compared to that of other parts. This could be attributed to the leakage of water in that area, in the past, through drain pipes etc. A. Proposal of remedial measures to rectify the damage in House A. Proposal of remedial measures to rectify the damage in House A. Proposal of remedial measures to rectify the damage in House A. Proposal of remedial measures to rectify the damage in House No. 706: No. 706: No. 706: No. 706: The remedial measures to rectify the damage in house no.706 need to be done in two phases.
Phase 1: Soil Strengthening Phase 1: Soil Strengthening Phase 1: Soil Strengthening Phase 1: Soil Strengthening The soil strata up to a depth of -4 m, under the wall foundations of House No. 706 should be consolidated by using deep injection grouting technique using expanding 2 deep injection of Geo-Resin in the soil strata below the foundations, re-level of the floors, doors and windows to be done by injection grouting. This work is required to be executed by a technical firm having prior proven experience of similar work. The budget estimate for the same has been given by URETEK India Pvt. Ltd., in its final report. (Annexure II). Phase 2: Repair of damaged components Phase 2: Repair of damaged components Phase 2: Repair of damaged components Phase 2: Repair of damaged components After Phase 1, the distress in the structure needs to be monitored for at least six months. If no further significant distress i. widening, appearance of new cracks, floor settlement etc, occurs then second phase of further repair works of damaged components to be done. Damaged floor tiles be replaced by new ones. Cracks in the brick walls be got repaired by epoxy injection
Initially, the trial Court passed order dated 23.02.2023 and sought a technical report of inspection. The Engineers of Punjab nspected the site and submitted a report dated As per the said report, while giving recommendations, proposal for remedial house No.706 were given as under:- CHAPTER 4 CHAPTER 4 CHAPTER 4 CHAPTER 4 CONCLUSIONS AND FINAL RECOMMENDATIONS CONCLUSIONS AND FINAL RECOMMENDATIONS CONCLUSIONS AND FINAL RECOMMENDATIONS CONCLUSIONS AND FINAL RECOMMENDATIONS The two houses i.e. House Nos. 706 and 705 were studied for their structural stability. It was found that the major damage in House No.706 occurred mainly due to settlement of soil below its vation of soil in House No.705 without having followed adequate protective measures for stability of the adjoining soil strata.
Further, outside the kitchen area of House No. 706, it was seen that soil conditions were very poor as compared to parts. This could be attributed to the leakage of water in that area, in the past, through drain pipes etc. A. Proposal of remedial measures to rectify the damage in House A. Proposal of remedial measures to rectify the damage in House A. Proposal of remedial measures to rectify the damage in House A. Proposal of remedial measures to rectify the damage in House The remedial measures to rectify the damage in house no.706 need 4 m, under the wall foundations of House No. 706 should be consolidated by using deep injection grouting technique using expanding 2-part Geo-Resins. After the Resin in the soil strata below the foundations, level of the floors, doors and windows to be done by injection grouting. This work is required to be executed by a technical firm having prior proven experience of similar work. The budget estimate r the same has been given by URETEK India Pvt. Ltd., in its final Phase 2: Repair of damaged components Phase 2: Repair of damaged components Phase 2: Repair of damaged components Phase 2: Repair of damaged components After Phase 1, the distress in the structure needs to be monitored for at least six months. If no further significant distress i.e. crack widening, appearance of new cracks, floor settlement etc, occurs then second phase of further repair works of damaged components to be done. Damaged floor tiles be replaced by new ones. Cracks in the brick walls be got repaired by epoxy injection followed by ATUL SETHI 2026.07.16 12:45 I attest to the accuracy and authenticity of this document Chandigarh
CR-4820-2026
3. 04.04.2026 injunction, whereby interior work in House No.705, but subject to the condition that no other construction affirmed by the Appellate Co while passing an interim order dated 26.05.2026 (Annexure P during the pendency of the Civil Misc. Appeal. Aggrieved against the 2026 -3- replastering and whitewash. Bent window grills be replaced by new ones. Wooden doors and windows be got repaired for their easy opening and closing.
The rough cost estimate for the repair works can be taken as about 4-5 lakhs. B. Recommendation B. Recommendation B. Recommendation B. Recommendation of retrofitting required in House No. 705. of retrofitting required in House No. 705. of retrofitting required in House No. 705. of retrofitting required in House No. 705. The following retrofitting works are required to be undertaken under technical supervision, in House No. 705 for the structural safety:
1. Three RC columns namely C undersized and need to be retrofitted in order to comply with the structural drawings. 2. The floor beam CB-5 at First, Second and Third floor level were found missing and need to be incorporated as per structural drawings. 3. The two footings F-2 and F-3 were found to be def to be retrofitted in order to comply with the structural drawings. 4. All other footings also need to be checked for their compliance with the structural drawings. If found deficient, they should be retrofitted accordingly. 5. The balance finishing works of the house may be executed after the retrofitting of the existing structure as stated above. Important Note: Important Note: Important Note: Important Note: It is pertinent to mention here that the conclusions of the present study and final recommendations are based on the provided by the house owners, tests conducted at site at the time of inspection by the PEC team in association with URETEK India Pvt. Ltd.” Thereafter, the trial Court passed the order dated 04.04.2026 (Annexure P-10), deciding the ap , whereby defendant Nos.1 to 4 were permitted to initiate the interior work in House No.705, but subject to the condition that no construction work shall be carried out. The said order was affirmed by the Appellate Court (Additional District Judge, Panchkula), while passing an interim order dated 26.05.2026 (Annexure P during the pendency of the Civil Misc. Appeal. Aggrieved against the
replastering and whitewash. Bent window grills be replaced by new ones.
Wooden doors and windows be got repaired for their easy opening and closing. The rough cost estimate for the repair works of retrofitting required in House No. 705. of retrofitting required in House No. 705. of retrofitting required in House No. 705. of retrofitting required in House No. 705. The following retrofitting works are required to be undertaken under technical supervision, in House No. 705 for the structural safety:
1. Three RC columns namely C-1A, C-2 and C-3 were found to be retrofitted in order to comply with the 5 at First, Second and Third floor level were found missing and need to be incorporated as per structural 3 were found to be deficient and need to be retrofitted in order to comply with the structural drawings. 4. All other footings also need to be checked for their compliance with the structural drawings. If found deficient, they should be inishing works of the house may be executed after the retrofitting of the existing structure as stated above. It is pertinent to mention here that the conclusions of the present study and final recommendations are based on the data/information provided by the house owners, tests conducted at site at the time of inspection by the PEC team in association with URETEK India Pvt. Thereafter, the trial Court passed the order dated , deciding the application for interim defendant Nos.1 to 4 were permitted to initiate the interior work in House No.705, but subject to the condition that no work shall be carried out. The said order was urt (Additional District Judge, Panchkula), while passing an interim order dated 26.05.2026 (Annexure P-12) during the pendency of the Civil Misc. Appeal. Aggrieved against the ATUL SETHI 2026.07.16 12:45 I attest to the accuracy and authenticity of this document Chandigarh
CR-4820-2026
said order, the petitioner Revision Petition. 4. learned Senior Advocate, assisted by Mr. Vrishank Suri, Advocate, representing the would carry out remedial measures suggested i 03.04.2024 and submit a compliance report Court/appe interior work. 5.
submitted that the present Revision Petition be disposed of accordingly, however, he will pursue his application filed under Section 151 of the Code of Civil Procedure, 1908, pending before the trial Court, pointing out the discrepancies in the approved plan and the building raised by respondent Nos.1 to 4, which shall be cons authority. 6. of. 7. statements made hereinabove. 8.
disposed of. 13 13 13 13.07 .07 .07 .07.2026 .2026 .2026 .2026 atulsethi
Whether speaking / reasoned : Whether Reportable :
2026 -4- said order, the petitioner-plaintiff is before this Court by filing present vision Petition. During the course of submission Senior Advocate, assisted by Mr. Vrishank Suri, Advocate, representing the private respondents has very fairly submitted that he would carry out remedial measures suggested i 3.04.2024 and submit a compliance report ellate Court, before carrying out further construction and interior work. Mr. Rohit Sud, Advocate representing the petitioner has submitted that the present Revision Petition be disposed of accordingly, however, he will pursue his application filed under Section 151 of the Code of Civil Procedure, 1908, pending before the trial Court, pointing out the discrepancies in the approved plan and the building raised by respondent Nos.1 to 4, which shall be cons
In view of the above, present revision petition is disposed It is made clear that both parties shall remain bound by the statements made hereinabove. Pending Civil Misc. application(s), if any, shall
disposed of. .2026 .2026 .2026 .2026
[HARPREET KAUR JEEWAN] [HARPREET KAUR JEEWAN] [HARPREET KAUR JEEWAN] [HARPREET KAUR JEEWAN]
Whether speaking / reasoned : Whether Reportable :
plaintiff is before this Court by filing present During the course of submissions, Mr. Akshay Jindal, Senior Advocate, assisted by Mr. Vrishank Suri, Advocate, has very fairly submitted that he would carry out remedial measures suggested in the report dated 3.04.2024 and submit a compliance report before the trial , before carrying out further construction and Mr. Rohit Sud, Advocate representing the petitioner has submitted that the present Revision Petition be disposed of accordingly, however, he will pursue his application filed under Section 151 of the Code of Civil Procedure, 1908, pending before the trial Court, pointing out the discrepancies in the approved plan and the building raised by respondent Nos.1 to 4, which shall be considered by the competent In view of the above, present revision petition is disposed It is made clear that both parties shall remain bound by the Pending Civil Misc. application(s), if any, shall also stand [HARPREET KAUR JEEWAN] [HARPREET KAUR JEEWAN] [HARPREET KAUR JEEWAN] [HARPREET KAUR JEEWAN]
JUDGE JUDGE JUDGE JUDGE Yes No Yes No ATUL SETHI 2026.07.16 12:45 I attest to the accuracy and authenticity of this document Chandigarh