Research › Search › Judgment

Madras High Court · body

2026 DAILYLAW 21065 (MAD)

Rosy v. The Superintendent of Engineer

WP(MD)/7837/2026 · 2026-03-24

Hemant Chandangoudar

Transfer Petitionbody2026

Judgment text

Extracted from the PDF above. The PDF is authoritative.

WP(MD). No.7837 of 2026 BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT Dated : 24/03/2026 CORAM THE HONOURABLE MR. JUSTICE HEMANT CHANDANGOUDAR WP(MD). No.7837 of 2026 Rosy ... Petitioner Vs 1. The Superintendent of Engineer, Tamilnadu Generation and Distribution Corporation Ltd., Ramanathapuram District.. 2. The Assistant Engineer, (Distribution), Tamilnadu Power Distribution Corporation Ltd., Paramakudi, Ramanathapuram District. ... Respondents PRAYER :- Writ Petition, filed under Article 226 of the Constitution of India, praying this court to issue a Writ of Mandamus for direct the Respondents to shift the electricity pole situated in Patta No.35, Survey No.234/7, town survey No.20/7, at Ward F, Block No.1 Kattuparamakudi Village, Paramakudi Taluk, Ramanathapuram District in Plot No.32, based on the petitioners representation dated 24.02.2026 within time stipulated by this Court. 1/4 https://www.mhc.tn.gov.in/judis WP(MD). No.7837 of 2026 For Petitioner : Mr. M.Boopathipandiyan, Advocate. For Respondent : Mr.S.Deenadhayalan Standing Counsel ORDER The petitioner, claiming that an electricity pole has been erected without his consent in his patta land, is before this Court seeking a direction to the respondent to consider his representation. By the said representation, the petitioner has requested the removal of the electricity pole alleged to have been unlawfully erected on his property. 2. The learned counsel for the respondents submitted that the petitioner’s representation would be considered in accordance with law within the time to be stipulated by this Court. 3. The said submission is placed on record. Accordingly, this writ petition is disposed of with a direction to the Assistant Engineer (Rural), Paramakudi, to consider the petitioner’s representation dated 24.02.2026, 2/4 https://www.mhc.tn.gov.in/judis WP(MD). No.7837 of 2026 on its own merits and in accordance with law, and to pass appropriate orders within a period of eight (8) weeks from the date of receipt of a copy of this order. 4. There shall be no order as to costs. 24.03.2026 NCC : yes / no Index : yes / no pnn To 1. The Superintendent of Engineer, Tamilnadu Generation and Distribution Corporation Ltd., Ramanathapuram District.. 2. The Assistant Engineer, (Distribution), Tamilnadu Power Distribution Corporation Ltd., Paramakudi, Ramanathapuram District. 3. The Assistant Engineer(Rural), Paramakudi, Ramanathapuram District. 3/4 https://www.mhc.tn.gov.in/judis WP(MD). No.7837 of 2026 HEMANT CHANDANGOUDAR,J pnn ORDER IN WP(MD) No.7837 of 2026 Date : 24/03/2026 4/4 https://www.mhc.tn.gov.in/judis