HARVINDER SINGH SABHARWAL v. MUNICIPAL CORPORATION OF DELHI AND ORS
W.P.(C)/5785/2026 · 2026-09-14
Amit Bansal
Writ Petition (Civil)body2026
DailyLaw.ai
[ 2026 DAILYLAW 18059 (DEL) · dailylaw.ai ]
DailyLaw.ai
[ 2026 DAILYLAW 18059 (DEL) · dailylaw.ai ]
Judgment text
Extracted from the PDF above. The PDF is authoritative.
W.P.(C) 5785/2026 $~6 * IN THE HIGH COURT OF DELHI AT NEW DELHI # CNR No. DLHC010182142026 + W.P.(C) 5785/2026 with CM APPL. 28476/2026 HARVINDER SINGH SABHARWAL .....Petitioner Through: Mr. Prakash Airan, Advocate versus MUNICIPAL CORPORATION OF DELHI AND ORS .....Respondents Through: Mr. Parminder Singh, Standing Counsel for MCD with Mr. Aryanshu Vaibhav Gautam, Advocate for R-1/MCD Ms. Archana Sharma, SPC for R-2/UOI Mr. Rudra Dutta, Mr. Neil Sinha, Mr. Anuj Mishra, Mr. Akhil Tewatia, Mr. Dev Sharma and Mr. Manswani Singh, Advocates for R-3 to R-6 CORAM:
HON'BLE MR. JUSTICE AMIT BANSAL O R D E R % 14.09.2026
1. The present writ petition has been filed seeking a direction to the respondent no.1/MCD to demolish the unauthorized construction being carried out by the private respondents no.3 to 6 in the property bearing no. L-69, Kalkaji, New Delhi-110019 (‘subject property’). 2. Counsel appearing on behalf of the petitioner submits that the petitioner is a next-door neighbour. It is contended that the private This is a digitally signed order. The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above. The Order is downloaded from the DHC Server on 16/09/2026 at 12:49:06
W.P.(C) 5785/2026 respondents no. 3 to 6 have carried out construction on the subject property without permission, inasmuch as the height of the building has been elevated beyond the permissible limits, permanent structures have been constructed on the rooftop, and there is unauthorized addition in the balconies. 3. Status report has been filed on behalf of the respondent no.1/MCD. 3.1. A copy of the same has been handed over in Court and the same is taken on record. 4. As per the status report, a building plan was sanctioned in respect of the subject property permitting construction of Basement, Stilt and Ground Floor to Third Floor. 5. Deviations were found in the construction in the form of excess coverage which were booked and a show cause notice was issued on 26th May, 2026. Subsequently, a demolition order was issued on 14th July, 2026. 6. Thereafter the private respondents filed an application for grant of occupancy-cum-completion certificate, which was granted after compounding the unauthorised construction. A copy of the occupancy-cum- completion certificate has been filed along with the status report (Annexure- D to the status report). 7.
Taking note of the aforesaid, the present writ petition is disposed of. 8. Pending application stands disposed of. AMIT BANSAL, J SEPTEMBER 14, 2026 ds This is a digitally signed order. The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above. The Order is downloaded from the DHC Server on 16/09/2026 at 12:49:06