GURUMURTHY ENGINEERING ENTERPRISES v. THE COMMISSIONER
WP/27170/2025 · 2025-07-23
N Mala
Transfer Petitionbody2025
DailyLaw.ai
[ 2025 DAILYLAW 79018 (MAD) · dailylaw.ai ]
DailyLaw.ai
[ 2025 DAILYLAW 79018 (MAD) · dailylaw.ai ]
Judgment text
Extracted from the PDF above. The PDF is authoritative.
WP No. 27170 of 2025 IN THE HIGH COURT OF JUDICATURE AT MADRAS DATED: 23-07-2025 CORAM THE HONOURABLE MRS.JUSTICE N. MALA WP No. 27170 of 2025 Gurumurthy Engineering Enterprises Rep., by its Partner T.Salvarai Petitioner(s) Vs
1. The Commissioner Greater Chennai Corporation, Ripon Buildings, Chennai 600 003 2.The Superintending Engineer Storm Water Drain Department, Greater Chennai Corporation, Chennai 600 003 3.The Executive Engineer, Zonal Officer, Zone -3, Greater Chennai Corporation, No 1 Thattankulam Salai, Bazar Road, Madhavaram, Chennai 600 060 Respondent(s) PRAYER This Writ Petition is filed under article 226 of Constitution of India to Direct the 3rd Respondent to conduct site inspection in our presence with their concerned Zonal Executive Engineer, Greater Chennai Corporation or their authorized representative and issue the site visit certificate to the petitioner considering the representation dated 02.07.2025 and 07.07.2025 as per Tender notification dated 26.06.2025 so as to enable the petitioner to upload the site visit certificate in the online portal on or before 28.07.2025 @ 03.00PM and allow the petitioner to participate in the Tender process. https://www.mhc.tn.gov.in/judis
WP No. 27170 of 2025 For Petitioner(s): Mr.A.Kumar For Respondent(s): Mr.G.T.Subramanian, St.C. for R1 To R3 ORDER This writ petition is filed seeking direction to the third respondent to conduct site inspection and issue a site visit certificate to the petitioner by considering the petitioner's representation dated 02.07.2025 and 26.06.2025.
2. The learned counsel for the petitioner would submit that the site visit certificate has been issued to the petitioner and therefore, the prayer sought for in this Writ Petition has become infructuous, and nothing survives further for adjudication in this matter.
3. Recording the submissions made by the learned counsel for the petitioner, this Writ Petition is dismissed as infructuous. No costs. 23-07-2025 jai https://www.mhc.tn.gov.in/judis
WP No. 27170 of 2025 To 1.The Commissioner Greater Chennai Corporation Ripon Building, Chennai 600 003 2.The Superintending Engineer Storm Water Drain Department, Greater Chennai Corporation, Chennai 600 003 3.The Executive Engineer, Zonal Officer, Zone -3, Greater Chennai Corporation, No 1 Thattankulam Salai, Bazar Road, Madhavaram, Chennai 600 060 https://www.mhc.tn.gov.in/judis
WP No. 27170 of 2025 N.MALA J. jai WP No. 27170 of 2025
23-07-2025 https://www.mhc.tn.gov.in/judis