Research › Search › Judgment

High Court of Andhra Pradesh · body

2025 DAILYLAW 19247 (AP)

K Veerendra Reddy v. The A.P Industrial Infrastructure Corporation,

WP/15681/2021 · 2025-03-19

T C D Sekhar

body2025

Judgment text

Extracted from the PDF above. The PDF is authoritative.

APHC010269562021 IN THE HIGH COURT OF ANDHRA PRADESH AT AMARAVATI (Special Original Jurisdiction) [3505] WEDNESDAY, THE NINETEENTH DAY OF MARCH TWO THOUSAND AND TWENTY FIVE PRESENT THE HONOURABLE SRI JUSTICE T.C.D.SEKHAR WRIT PETITION NO: 15681/2021 Between: K Veerendra Reddy ...PETITIONER AND The A P Industrial Infrastructure Corporation and Others ...RESPONDENT(S) Counsel for the Petitioner: 1. RAMALAKSHMANA REDDY SANEPALLI Counsel for the Respondent(S): 1. GP FOR ASSIGNMENT 2. . 3. J UGRANARASIMHA (SC FOR APIIC) 4. GP FOR ASSIGNMENT The Court made the following order: The learned counsel for the petitioner seeks permission of this Court to withdraw the writ petition. 2. Permission is accorded. 3. Accordingly, the Writ Petition is dismissed as withdrawn. There shall be no order as to costs. 4. As a sequel, miscellaneous applications pending, if any, shall stand closed. ____________________ T.C.D.SEKHAR,J Date: 19.03.2025 ANS 4 THE HONOURABLE SRI JUSTICE T.C.D.SEKHAR WRIT PETITION NO: 15681/2021 Date: 19.03.2025 ANS