JUDGMENT : (J.B. Pardiwala, J.): 1. This is a petition under Section 11(6) of the Arbitration and Conciliation Act, 1996 (for short, “the Act 1996”) filed at the instance of a company based in Switzerland and engaged in the business of design consultancy seeking appointment of an arbitrator for the adjudication of disputes and claims emanating from the Contract dated 25.10.2019 entered into between the petitioner and respondent i.e., Uttarakhand Vidyut Nigam Limited (a wholly owned corporation of the Government of Uttarakhand). FACTUAL MATRIX 2. The petitioner is a design consultancy firm based in Switzerland, having its registered office at Via Del Tiglio 2, PO Box 934, CH 934, CH 6512, Bellinzona-Guibiasco, Switzerland and local Indian address at B3/61, 1st Floor, Safdarjung Enclave, Delhi – 110029. 3. The respondent is a wholly owned corporation of the Government of Uttarakhand having its registered office at Maharani Bagh, GMS Road, Dehradun, Uttarakhand, India and is engaged in the business of operating hydro power plants in the State of Uttarakhand. 4. The petitioner entered into a contract with the Uttarakhand Project Development and Construction Corporation Limited (hereinafter referred to as “UPDCC”) for “Providing consultancy services and preparation of modified comprehensive and bankable Detailed Project Report of Arakot Tiuni Hydro Electric Project on river Pabar in district Uttarkashi of Uttarakhand” dated 25.10. 2019 (Tender Reference No. 01/DGM/UPDCC/2018-19) (hereinafter referred to as, ‘the Contract’ or ‘the Project’). The Project was valued at Rs. 1,39,45,000/- (Rupees One Crore Thirty-Nine Lac Forty-Five Thousand only) (hereinafter referred to as the “Contract Value”). The petitioner was to commence work on the date of the execution of the Contract, i.e., 25.10.2019 and complete the work within 24 months, i.e., by 25.09.2021. 5. The Schedule A to Clause 5 of the Special Conditions of Contract (SCC) (hereinafter referred to as the “Schedule A”) provided for the completion period of all works that the petitioner was required to carry out under the Project. Further, the Schedule B to Clause 5 of the SCC (hereinafter referred to as the “Schedule B”) provided for the payment that was to be released to the petitioner upon the completion of each stage of work. 6. The respondent took over the said Project from the UPDCC pursuant to an order dated 08.05.2020, passed by the Government of Uttarakhand, which directed that the Project be transferred from UPDCC to the respondent. 6. The respondent took over the said Project from the UPDCC pursuant to an order dated 08.05.2020, passed by the Government of Uttarakhand, which directed that the Project be transferred from UPDCC to the respondent. The takeover of the Project was done by virtue of a tripartite agreement dated 06.10.2020 (hereinafter referred to as the “Tripartite Agreement”), whereby the Contract was novated to the extent that the respondent stepped into the shoes of UPDCC and took over all the obligations under the Contract. 7. The Clause 53 read with Clause 55 of the General Conditions of Contract (hereinafter referred to as “GCC”), which forms part and parcel of the Contract between the petitioner and the respondent, set out the Arbitration Agreement. The said clauses are reproduced hereinbelow for reference: “CLAUSE-53: PROCEDURE FOR CLAIMS: 53.1 If a dispute of any kind, whatsoever, arises between the Employer and contractor in connection with or arising out of the contract for the execution of this works, whether during the execution of the works or after their completion and whether before or after repudiation or termination of the contract, including any disagreement by either party with any action, inaction, opinion, instruction determination, certificate or valuation of the Engineer, the matter in dispute shall, be referred to in accordance with the provisions of the Arbitration and Conciliation Act, 1996 or any statutory modification or re-enactment thereof and the rules made the under and for the time being in force, shall apply to the arbitration proceedings. 53.2 The contractor shall submit the details of his claims in writing including: (i) Particulars concerning the events on which the claim is based; (ii) the legal basis for the claim, whether based on a term of the Contract or otherwise, and if based on a term of the Contract, clearly identifying the specific term; vii) the facts relied upon in support of the Claim in sufficient detail to permit verification; and viii) details of the amount claimed and how it has been calculated. Xxx xxx xxx CLAUSE-55: ARBITRATION: (a) All question and disputes relating to the meaning of the specification design, drawing and instructions herein and as to the quality of workmanship or materials used on the work or as to any other question claim, right, matter or thing, whatsoever in any way arising out of or relating to the contract, designs, drawings, specification, estimates instructions