Amendment status not verified — confirm the current text below against the official source.
(a) Any person having own land or building within the urban new and sem- urban areas where water supply facility is made available by the Department may apply to the Executive Engineer concerned in prescribed form for pipe water connec- tion; (b) The application so received shall be recorded by cerned Executive Engi- neer who shall submit the same to the Government or any other officers authorised in this behalf for sanction if technically found feasible. (c) After obtaining sanction of the Government or the authorised officer, the concerned Executive Engineer shall prepare estimate after detailed site inspection/ mesurement as may be necessary. The estimate so prepared will among others include cost of materials, wages of labour. Consumer of Water Procedure of new Water Con- nection Shor tent, menc Ex-52/91 - 2 - (d) The etimate duly approved by the Executive Engineer shall be submitted to the applicant who will deposit the amount under the Head-Deposit-II1 After the estimated amount is deposited, the concerned Executive Engineer shall cause to pro- vide water connection as expeditiously as posible and allot a definite consumer num- ber : (e) The Water Connection shall be ordinarily provided from the supply tank, In case, this is not feasible, the concerned Executive Engineer shall obtain approval of the concerned Superintending Engineer for providing water connection from other than supply tank; (f) A galvanised Iron Pipe of 15 millimeter diameter or 20 millimeter diam- eter of medium quality shall be normally used for providing water connection. In the event of any requirement of bigger size of Galvanised Iron Pipe, the concerned Execu- tive Engineer shall obtain prior approval of concerned Superintending Engineer; (g) The water connection shall be provided to the ground floor or any other floors below the ground floor of any building only.