Bare ActsThe Paramedical Act

Section 4

QUALIFYING CRITERIA

Amendment status not verified — confirm the current text below against the official source.

QUALIFYING CRITERIA .—The eligible organisation shall abide by Madhya Pradesh Saha Chikitsiy Parishad Act, 2000 as modified from time to time and the regulations framed thereunder and shall qualify to apply for permission to establish new Saha Chikitsiy Shikshan Sansthan only if the following conditions are fulfilled: (1) that Para Medical Education (Saha Chikitsiy Shikshan Sanstha) is one of the main objective of the applicant. (2) that . . . . plot of land as prescribed by the Madhya Pradesh Saha Chikitsiy Parishad is owned and possessed by the applicant to set-up the proposed Saha Chikitsiy Shikshan Sansthan the live acres of land for degree and diploma & 3 acres for certificate courses. (3) that essentiality certificate regarding the desirability and fesibility of having the proposed Saha Chikitsiy Shikshan Sansthan at. the proposed location has been obtained and that the adequate clinical material is available as per Madhya Pradesh Saha Chikitsiy Parishad requirements has been obtained by the applicant from the respective State Government or the Union Territory Administration or Collector of the district within the State. (4) that consent of Affiliation for the proposed Saha Chikitsiy Shikshan Sansthan has been obtained (> by the applicant from a recognised university for degree and diploma courses. Isuk«« «a V § l cVi,1 0 /■ V \./ TlttTS&Ff. WIii, f<HT?F 18. 3T^rt 20.02 . ,.. . . ; . 993 (93) (2) Information regarding basic infrastructural facilities and managerial and financial capacities ol the applicant and (3) Information regarding availability of necessary certificate and consents as proposed in the qualifying erircra. Purt-B Pai't-B of the application will contain detailed description of the scheme to set up to new Para educational institution and will be, submitted in the form of.a detailed Techno-Economic Feasibility Report about the proposed Para Medical educational institution complete with the following — (I) name and address of the educational institutions.' (2) market survey and environmental analysis including national and regional educational policy need and availability of trained paramedical manpower gap analysis, desirability and primafacc fusibility of establishing a new paramedical educational institution at the proposed location. (3) site characteristics and availability of cxilernal link age including lopogrnphy plot size, pcrmissiable floor space index ground coverage, building height, road access, availibility of public transport, electric supply, water-supply, sewage connection,'telephone lines etc. (4) .educational programme including annual intake of students admission criteria and method of admissioin reservation preferential allocation of seals fit* any) department-wise and year wise .r. curriculum of stutics, t e ■ f3)...'..functional programme'including department-wise service-wise functional requirements and area distribution and roonvwise sealing capacity. ..equipment programme including room-wise list of medical scientific and allied equipment 0 ;\. complete with schedule-of quantities and specifications. (7) manpower programme including department wise requirement of teaching staff (full-time) technical administrtive and ancillary staff, category-wise recruitment critcnn and salary structure etc. minimum as per M/P. State Government scale. (X) building programme : including huilding-wisc-built-up area of the educational insitituions faculty and staff housing, staff and student hostel, administrative office, library, auditorium animal house mortuary and other infrastructural facilities such as cultural and recreational centrcsport complex etc. (9) planning and layout : including master plan of the educational institution complex, layout plant sections vations and floor-wise area ejaculations of the educational institutions and ancillary banking etc. v : l 0 :- i u i u r (_/4 V V_/' ' n O'' 3 (■ O'''; i O '. (10) phasting and scheduling : including month-wise schedule of activities indication commencement and completion of building design, local body aprovals, civil construction and equipment, recruitment of staff and phased commissioning commensurate with the proposed intake of students. (11) project cost : including capital cost of land buildings plant and machinery, medical scientific and allied equipment, furnuture and fixtures, and preliminary and pre-operative expenses, 992 (9 5 ) v:.- Vy7 > 7 / U " L / x \m ^ t f^ri^ is 2002 (11) phasing and scheduling of the expansion scheme: including "mrintK-wTse' master ' schedule of' activities indicating commencement and completion of building design, local body approvals, civil construction, hospital services, provision of medical and allied equipment, recruitment of staff etc to commensurate with the development of the proposed educational institutions. (12) project cost of the expansion scheme: including additional cost of land, buildings, hospital services, medical and allied equipment, furniture and fixtures and preliminary and pre- operative expense. (13) means of financing the cost of expansion scheme; including contribution of the applicant grams and donation, equity and term loans and other sources, if any; (14) revenue assumptions: including details of income from various procedures and services upgraded service loads and annual revenue; (15) expenditure assumptions: including operating expenses, financial expenses, and depreciation; and (16) operating results: including income statements,'cash flow statements and balance sheets,

Section 4 – The Paramedical Act | DailyLaw.ai