Amendment status not verified — confirm the current text below against the official source.
The provisions under these Regulations shall be applicable for determining the project specific tariff/ generic tariff as determined by the Commission for the electricity generated from Renewable Sources of Energy plants [declared date of commercial operation (COD)] during the control period specified in these Regulations, under Section 62 read with Section 86 of the Electricity Act, 2003. [Provided that, if the tariff has been determined based on the norms and parameters specified in any of the previous Regulations or the generic tariff approved in any of the previous Regulations, it shall not be redetermined for the electricity generated from the RE projects which have already declared commercial date of operation during the period prior to the control period specified in these Regulations till the completion of the period for which the tariff has been determined.] Replaced the word "commissioned" by K. G. Ex. No. 2381 dt.18/07/2022 (w.e.f.01/08/2022). Added by K.G.Ex.No.2381.dt.18/07/2022.(w.e.f.01/08/2022).