Amendment status not verified — confirm the current text below against the official source.
(1) The distribution licensee or the State transmission utility, as the case may be, shall on demand, provide connectivity for the renewable energy generation system, as per the provisions, specified in KSERC (Connectivity and Intra State Open Access) Regulations, 2013, as amended from time to time. Provided that, if the distribution licensee delays granting connectivity with reference to the time lines specified in KSERC (Connectivity and Intra State Open Access) Regulations, 2013, as amended from time to time, the Commission may take action against the licensee as per the provisions of the Electricity Act, 2003. (2) The interconnection of the renewable energy system with the transmission and/or distribution system shall conform to the provisions under the Central Electricity Authority (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, 2013 and Central Electricity Authority (Measures Relating to Safety and Electric Supply) Regulations, 2010, and other applicable regulations dealing with connectivity and safety, as amended from time to time.