Amendment status not verified — confirm the current text below against the official source.
(1) The interconnection of the renewable energy system with the distribution system of the licensee shall conform to the specifications and standards as provided in the Central Electricity Authority (Technical Standards for connectivity of the Distributed Generation Resources) Regulations, 2013 and to the relevant provisions of the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010, as amended from time to time; (2) The Net meter and Renewable energy meter installed shall conform to the standards, specifications and accuracy class, as provided in the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, as amended from time to time and be installed in such a manner that they are accessible for reading. (3) The licensee shall, while intimating the feasibility as per these Regulations, inform the prosumer, the specifications and such other details of the components, if any, to be installed along with the renewable energy system as per the provisions of these Regulations. (4) The prosumer shall comply with the specifications and standards as provided by the licensee and shall install manually operated isolating switch and grid-tied inverter/associated equipment with sufficient safeguards to prevent injection of electricity from the renewable energy system to the distribution system of the licensee when the distribution system is de-energized.