Amendment status not verified — confirm the current text below against the official source.
Every application to be made under section 6 shall include,- (a) a description of the undertaking and of the route to be followed by the proposed aerial ropeway ; (b) a description of the system of construction and management and of the advantage to the community to be expected from such ropeway ; (c) an estimate of the cost of construction thereof ; (d) a statement of the estimated working expenses and profit in respect thereof ; (e) a statement of the maximum and minimum rates which it is proposed to charge; (f) such maps, plans, section and drawing in connection therewith as the State Government may require in order to form an idea of the proposal. 3[(g) a description of basic engineering design and risk analysis of ropeway, schemes for safety requirements and emergency plan for rescue operations; Appointment of inspectors and subordinate officers and servants and their powers and duties. Unauthorised construction, maintenance etc, of aerial ropeways prohibited. Application for concession. Contents of application. [1956: Bom. III (h) drawings showing the electrical layouts control circuits, lighting circuits and earthing systems; (i) such other information and documents as may prescribed].