Amendment status not verified — confirm the current text below against the official source.
Subs. by Act 49 of 2007, S. 8(b), for: “(3) On the said date the Inspector shall proceed to measure and examine the boiler and to determine in the prescribed manner the maximum pressure, if any, at which such boiler may be used, and shall report the result of the examination to the Chief Inspector in the prescribed form”, w.e.f. 27.5.2008. 9 (5) The Chief Inspector shall, on registering the boiler, order the issue to the owner of a certificate in the prescribed form authorising the use of the boiler for a period not exceeding twelve months at a pressure not exceeding such maximum pressure as he thinks fit and as is in accordance with the regulations made under this Act: 31[Provided that a certificate issued under this sub-section in respect of an economiser 32[or of an unfired boiler which forms an integral part of a processing plant in which steam is generated solely by the use of oil, asphalt or bitumen as a heating medium] may authorise its use for a period not exceeding twenty-four months.] (6) The Inspector shall forthwith convey to the owner of the boiler the orders of the Chief Inspector and shall in accordance therewith issue to the owner any certificate of which the issue has been ordered, and, where the boiler has been registered, the owner shall within the prescribed period cause the register number to be permanently marked thereon in the prescribed manner.