Bare ActsThe Aerial Ropeways Act, 2022

Section 8

Amendment status not verified — confirm the current text below against the official source.

ay @ (ix) the rules relating 1o the construction of the aerial () the conditions undér which the promote; may séll or (xi) the conditions under-which the aerial ropeway may be taken over by the Government to be worked by itself or by a local authority or by a person other than the promoter; (i) the motive power to be used on the aerial ropeway and the conditions, if any, on which such power may beused; (xiif) the minimum headway 1o be maintained under different parts of the rope; (%iv) the minimum headway of 10 meters between the rooftop of the houses or buildings and base of the cabin, in the case of Topeway projects to be build under Public Private Partnership (PPP) mode; (xv) the points under the aerial ropeway at which bridges or i guards shall be constructed and maintained; (xvi). the traffic which may be carried on the fopeway, the traffic which the promoter shall be bound to carry and the'traffic which he may refuse to carry; (xvi) the maximum rates that may be charged by the promoter, and the circumstances in which, and the manner in which, these rates may be revised by the Government; (xvid) the amount of security, if any, to be deposited by the promoter in the event of his application being granted; and (xix) such other matters as the Government may deem necessary. If, after considering objections or suggestions which may have been made in respect fo the draft on or before the;specified date, the Government is of the opinion that the application should be granted, with or without modification, or subject or not to any restriction or condition, it may make an order agcordingly. Bvery order authorising the construction of an aerial ropeway shall be published in the Official Gazette, and such publication hall be conclusive proof that the order has been made as requited by this section. If a promoter authorised by an order to construct an acrial ropeway does not, within the time specified in the order,- THE ASSAM GAZETTE, EXTRAORDINARY, OCTOBER 11, 2022 9627 Further order Inspection of acrial ropeways before.opening Expert Commitiee 9

Section 8 – The Aerial Ropeways Act, 2022 | DailyLaw.ai